The Team One Difference

Team One sets itself apart by creating valuable, sustainable solutions that exceed our clients’ expectations. Implementation of our scaffold management and permanent structure programs can positively impact plant operations in several ways.

  • Safety

    Our programs increase safety by eliminating free climbs during installation with a positive locking system which mitigates the use of hand tools during installation.
  • Quality

    Excel scaffold is ISO 9000:2001 qualified and engineered for rigging and fall protection tie points. In addition, Excel’s modular patented design is seismically qualified, minimizing or eliminating future inspections.
  • Cost & Time Savings

    Our programs result in a reduction of critical path time, outage duration, person- hours and OSHA-required inspection time. Scaffold costs are reduced by eliminating repetitive builds in safety-related areas. Further reduction in time and cost is realized in using our material versus the conventional structural steel framing.
  • Reduced Radiation Exposure

    Our programs reduce radiation exposure by eliminating temporary scaffold and/or shielding installation and removal work.
  • Bundled Service Offerings

    Through its affiliate companies Excel, Deltak, AES, CSA & UniTech, Team One offers adjacent services including engineering, custom fabrication, 3D laser scanning and technical management augmentation.
  • Compliance

    Plants are experiencing increased demand for dose reduction and implementation of well-structured scaffold management programs from industry regulators. Our program supports compliance with guidelines issued by EPRI, INPO, Code of Federal Regulations and the U.S. NRC.